ADU Design & Construction

Explore expert guidance and resources for building your ADU in Bend.

Finding and hiring a designer, architect, and contractor

Once you’ve planned how you will finance your ADU and have begun the permitting process, it’s time to start the design phase. Permitting and construction will then follow. Below we answer common questions about where to find architects and contractors and how to navigate agreements.

Here is a suggested list of companies that specialize in or have experience with designing and building ADUs. This is by no means a comprehensive list.

Additional resources can be found within the Bend Chamber Member Directory.

If you are a contractor or builder and would like to be added to this list, contact the Bend Chamber.

The design or construction professional may have their standard form of agreement. It is recommended that an Owner compare this agreement to industry standard forms. Standard forms for small projects can be reviewed and purchased through the AIA link.

Architects and contractors often include or attach their own qualifications, clarification and exclusions. Owners should be comfortable with the overall project expectations.

While payment procedures are often detailed in the agreement, it is not unusual for both design and construction to expect an initial down payment or mobilization. Additional payments are typically made when project milestones are achieved. This may include the conclusion of a specific design phase or reflect a percent of completed construction on a monthly basis.

For construction, it is not uncommon to hold back 5-10% of the monthly payments in retainage that is held until the project is completed. Where the retainage funds are held is something that should be determined prior to signing the agreement. If you have a lender, they may also have input on the payment procedures and retainage.

The State or Oregon requires a contractor to provide a notice to inform Owners about construction lien laws. This form is provided here and includes general information along with common questions and answers. It is important for Owners to familiarize themselves with construction liens as it may stall a project under construction or affect project financing.

While having the scope clearly and completely documented in both agreements and construction documents is critical to minimize unexpected costs, there are often conditions that arise during both design and the course of construction that result in additional fees or costs. For these events, a contingency should be set aside to cover the cost increases. A contingency can cover late Owner-initiated design changes, unexpected field conditions, or even Owner requested changes during construction. Depending on project size and complexity, the contingency could be anywhere from 5-10% of the total project cost and should be accounted for in the project financing.

If there is a change during design that is beyond the original scope of work, the architect may charge for additional services. If the change occurs during construction it is known as a change order. A construction change order may include either a change in the contract time, an increase or decrease in the contract sum, or both.

The best way to protect a project from additional costs or changes is to have clear and complete documents from design to construction. If there is a scope item that is expected, but not clearly defined, the project team may decide to track the item as an allowance. Allowances are different from contingencies in that they are included in the project sum as a placeholder for a known amount. An allowance is for anticipated work rather than unforeseen work.

The construction market is impacted by national and global events. Whether it is a hurricane in the gulf, unrest in other parts of the world or a health crisis that affects us all, the cost of material and labor can fluctuate. To account for the volatility, a project cost may also include escalation. Similar to contingency, escalation is often accounted for as a percentage of the project total.

Depending on the schedule, escalation may be higher if the project is a few years out or lower if construction is expected in the next several months. These same external events may also affect product procurement or the ability to secure materials and equipment for the project. Contractors should order materials with long lead times early in the project to ensure timely project completion.

All projects should have a schedule for both design and construction. A schedule is used to track progress, payments and other interfaces with the project. Changes to the schedule should be documented through additional services or the change order process noted above. If the Owner hires a consultant directly or purchases material, these efforts should be accounted for in the schedule to coordinate with the architect or contractor. A schedule is often included as part of the contract or form of agreements to establish clear expectations and responsibilities during design and construction.

A tiny house with a trailer parked in front of it.

City of Bend's Pre-Approved ADU Unit Program

The Pre-Approved Accessory Dwelling Unit Program encourages the construction of ADUs by offering a faster path through the building permit process while also reducing pre-construction costs. This is possible because the program allows property owners to use an ADU building Plan that has already passed Building Plan Review and meets building code.

Program details

Bend Chamber Pre-Approved ADU design library

The Pre-Approved Accessory Dwelling Unit (ADU) Design Library is the result of the Bend Chamber’s continued efforts and shared values with the City of Bend to encourage and incentivize the construction of ADUs. The City’s housing strategy encourages the development of more diverse housing units and recognizes that ADUs are an integral part of the housing continuum.

View library
A small gray house with a red chair in front of it.

The Bend Chamber is actively supported by these Signature Investors

US Bank
Providence Health Plan
Pacific Source
Meta
Cascade Natural Gas